When you call us, here’s what we will ask you
For alternating-current projects we need to know the voltage and wattage.
When reactive loads are involved, we need to know the frequency.
For direct-current projects we need to know the voltage and current.
Technical Requirements
What is the total distance between the equipment to be tested and the load banks? (feet / meters)
What is the expected rental period? (daily, weekly, monthly)
What type of equipment will be tested? (application)
Who will be performing the tests?
How will the heat be dissipated? (vertical or horizontal)
Where will the units be delivered?
Do you need help with system design or operation?
What date will you require the load banks on site?